thanks for the update regarding the jack-up rig. for my own information i wanted to then confirm how many wells mitra were drilling. the text below confirms that this spud (on the 28th May) was the second of two -see text below from their website. Assuming, the second well takes about as long as the first (20 days or so). then the rig should be heading north toward block 105 around the 17th June. So we should be there or thereabouts for a June start date.
Site survey work was completed during late 2012 in preparation for the drilling of two exploration wells within the block in Q2 2013.
NEN Price at posting:
27.5¢ Sentiment: Hold Disclosure: Held