LOM 0.00% 4.0¢ lucapa diamond company limited

Pulling out an unused napkin,1. First assumption regarding...

  1. 216 Posts.
    Pulling out an unused napkin,
    1. First assumption regarding grades: one figure seen recently here for Lulo is 9-20 carets/100 ton alluvial. Another quoted is 0.3 to 1.0 carets per ton.
    2. Assuming pricing of us$100 for gem quality and us$70 for near gem
    3. Assume carets retrieved are 70% gem and rest near gem
    4. 40% of sales are due to LOM before expenses.
    6. Assume 600 tons processed per week.
    5. The before expenses "cash flow" from sales comes out as low as us$7200 per month (9 CPHT) and as high as us$95,000 per month (1CPT).
    6. I'm still scratching my head
 
watchlist Created with Sketch. Add LOM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.