ECT 0.00% 0.3¢ environmental clean technologies limited.

S Skim,The design is modular and is Proven by ARUP to run at...

  1. 6,284 Posts.
    S Skim,

    The design is modular and is Proven by ARUP to run at +10% of it's intended thu-put....not plus or minus as some misconstrued the document.

    Each module will run a siamesed hopper and delivery system and will deliver 10's of thousands of tonnes per annum...so if one conveyor system is down for maintenance or one of the other sub systems, it will not effect the engineered and designed guaranteed thru put numbers...there will be banks and banks of em over hectares.

    The coy has been very diligent in picking it's capex, opex, and legal entities...ARUP, MCCONNELL DOWEL, TRANSFIELD, DEACONS.

    It has also done well in securing the extremely appropriate services of Mr Steve Carter...

    You don't get the gig as Project mgr responsible for the construction of the Crown Casino without...chutzpa of the most conforming establishment kind
 
watchlist Created with Sketch. Add ECT (ASX) to my watchlist
(20min delay)
Last
0.3¢
Change
0.000(0.00%)
Mkt cap ! $9.515M
Open High Low Value Volume
0.3¢ 0.3¢ 0.3¢ $3.469K 1.156M

Buyers (Bids)

No. Vol. Price($)
46 19513067 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 11596834 27
View Market Depth
Last trade - 15.57pm 21/06/2024 (20 minute delay) ?
ECT (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.