XST 6.67% 1.6¢ xstate resources limited

Anshof Permanent Production Facility Commissioned and Anshof-3...

  1. 5,754 Posts.
    lightbulb Created with Sketch. 500

    Anshof Permanent Production Facility Commissioned and Anshof-3 Production Recommencement

    Anshof Permanent Production Facility has been successfully installed and commissioned at the Anshof-3 location.

    Production from the Anshof-3 well has recommenced
    at an initial 134 barrels of oil per day

    Key points:

    • The Permanent Production Facility (PPF), with a capacity of 3,000 barrels of liquids per day, was successfully installed and commissioned on the 3rd April 2024 at the Asnhof-3 well site. The Anshof-3 well is located in the Anshof Field Area within the ADX-AT-II licence in Upper Austria.
    • The Anshof PPF was installed and commissioned safely, on time and within budget.
    • Oil production from the Anshof-3 well has recommenced at 134 barrels of oil per day (bopd), with no produced water, representing a 16% increase to the production rate when the well was shut-in in September 2023.
    • Recommenement of oil production from the Anshof-3 well substantially increases the Company’s revenue and cash flow generation and allows ADX to take advantage of the improved oil price environment.

 
watchlist Created with Sketch. Add XST (ASX) to my watchlist
(20min delay)
Last
1.6¢
Change
0.001(6.67%)
Mkt cap ! $5.144M
Open High Low Value Volume
1.5¢ 1.6¢ 1.5¢ $16.88K 1.059M

Buyers (Bids)

No. Vol. Price($)
1 393318 1.5¢
 

Sellers (Offers)

Price($) Vol. No.
1.7¢ 187560 1
View Market Depth
Last trade - 15.11pm 15/05/2024 (20 minute delay) ?
Last
1.7¢
  Change
0.001 ( 6.25 %)
Open High Low Volume
1.5¢ 1.7¢ 1.5¢ 290932
Last updated 15.11pm 15/05/2024 ?
XST (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.