-
Share
20/12/11
12:36
Share
Time to move on
The earthquake issue was done to death weeks ago
The focus is four current planned wells By End of 2011
By 31.12 -
# 6 - In Production at say 367 barrells
# 8 - In production at a level possibly higher tah #6, based on Fracc fluid returns
#9 - Drilled, and probably tested
#9.2- Drilled, awaiting testing
So possibly 720 BOPD by Jan 2012 with 2 more wells on line In January, with further drilling underway
i.e 65 k gross Per day by end of month
Just enjoy the ride rather than ripping everyone to shreds
-