Pressure testing of the HM Brian No.1 well casing as part of the preparation for perforation has identified a small leak which is currently being isolated and repaired.
Due to the delay for repair, the perforation and flow testing of the well in the Tuscaloosa sand, at a depth of just over 17,000 feet, is now planned for next week.
Pressure testing of the HM Brian No.1 well casing as part of the...
Add to My Watchlist
What is My Watchlist?