I’m loading up the base of the hole with a contact adhesive (already had it didn’t buy it specifically), only put in enough to cover bottom of hole by approximately 2-3mm.
Will add a few bits of Cu off cuts and possibly SS bolts/nuts that are buggered in on the next pour of adhesive to reduce volume of adhesive needed.
Was thinking of fashioning 2 plates, top of foot and bottom of folly so I can spread the load a bit.
What do ya reckon?
- Forums
- Lifestyle & Travel
- A Team opinions appreciated
I’m loading up the base of the hole with a contact adhesive...
Featured News
Featured News
The Watchlist
RAC
RACE ONCOLOGY LTD
Dr Pete Smith, Executive Chairman
Dr Pete Smith
Executive Chairman
SPONSORED BY The Market Online