Just my musings as I have nothing else to do being on lockdown!!
So we are waiting on:
1. JRC001 – PGE assay results
2. JRC002 – official assay results although XRF showed no nickel or Cu
The interesting bit is the drilling timeline. On the 22 March it was reported that JRC002 was at a depth of 184m and then two days later had drilled to 280m and XRF analysis performed and released on the ASX.
I am no driller and someone could tell me average RC daily meters that can be drilled?
My thinking is have both of these other conductors already been drilled that is B and C?
If we get the assay info followed by what the initial core looks like from B+C we could be in for a very interesting week.
- Forums
- ASX - By Stock
- CHN
- A week to remember coming up???
A week to remember coming up???
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CHN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.58 |
Change
-0.040(2.48%) |
Mkt cap ! $612.6M |
Open | High | Low | Value | Volume |
$1.61 | $1.61 | $1.52 | $6.492M | 4.173M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 49513 | $1.58 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.59 | 26950 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 49513 | 1.575 |
2 | 70822 | 1.560 |
1 | 12048 | 1.555 |
3 | 45048 | 1.550 |
2 | 13948 | 1.545 |
Price($) | Vol. | No. |
---|---|---|
1.585 | 26950 | 4 |
1.590 | 108774 | 2 |
1.595 | 34838 | 4 |
1.600 | 203931 | 8 |
1.605 | 49307 | 4 |
Last trade - 16.10pm 05/06/2024 (20 minute delay) ? |
|
|||||
Last
$1.57 |
  |
Change
-0.040 ( 2.47 %) |
|||
Open | High | Low | Volume | ||
$1.59 | $1.59 | $1.52 | 866185 | ||
Last updated 15.59pm 05/06/2024 ? |
Featured News
CHN (ASX) Chart |
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Anthony Noble, CEO
Anthony Noble
CEO
Previous Video
Next Video
SPONSORED BY The Market Online