COE 4.88% 19.5¢ cooper energy limited

OK - how about this? 2GB "Following delays, the Snowy Hydro 2.0...

  1. 8,589 Posts.
    lightbulb Created with Sketch. 2848
    OK - how about this?

    2GB

    "Following delays, the Snowy Hydro 2.0 project, which is promised to store enough energy to power three million homes, will not be fully operational until December 2029.

    Paul Broad, who was the CEO of Snowy 2.0 for a decade, believes that Minister for Energy Chris Bowen needs to face some “hard truths”.

    “The notion that we can have 80 per cent renewables by 2030 is bullshit,” Broad told Ben Fordham.
    “Eraring CANNOT close…If the lights don’t go out I’ll be awfully surprised,” he said..."

    thats from 2GB site (publicly available)
    https://www.2gb.com/its-bullsht-former-snowy-2-0-boss-sprays-chris-bowen/

    OR - how about this?

    Executive who's spent decades at the top of Australia's electricity industry provides grim and brutal assessment on pledge to have 80% green power by 2030: 'Total B.S.'

    Energy Minister Chris Bowen has been slammed by the former Snowy Hydro 2.0 boss over the government's plan to switch Australia to renewable energy in eight years.

    'The notion that we can have 80 per cent renewables by 2030 is bulls***,' CEO Paul Broad told Radio 2GB in a shocking interview on Thursday morning.

    'The truth is ... this transition (to renewables), if it ever occurs, it will take 80 years... not eight.'

    (and yep am not a fan of Daily Mail !!)
    https://www.dailymail.co.uk/news/ar...ustralian-renewable-energy-plan-total-BS.html
 
watchlist Created with Sketch. Add COE (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
-0.010(4.88%)
Mkt cap ! $514.8M
Open High Low Value Volume
20.0¢ 20.5¢ 19.5¢ $396.5K 1.992M

Buyers (Bids)

No. Vol. Price($)
7 543935 19.5¢
 

Sellers (Offers)

Price($) Vol. No.
20.0¢ 449778 2
View Market Depth
Last trade - 16.10pm 03/09/2024 (20 minute delay) ?
COE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.