-
Share
11,703 Posts.
1077
12/10/17
08:45
Share
With significant historical drills, metallurgy and data at fort cady.
ABR has rapidly progressed their scoping studies which includes options to produce boric acid and lithium by product production pathways.
The early scoping study is positive even without the inclusion of lithium by products
Moving ahead at a rapid phase with targeted phase 1 production around mid 2019.
Last edited by
Quanta:
12/10/17