G1A 0.00% 5.9¢ galena mining limited

Abra Construction Phase

  1. 204 Posts.
    lightbulb Created with Sketch. 51
    With the major deal with Toho complete, we are now fast-tracking towards construction at the Abra site. I though I'd start a thread where we can monitor activity at the site. Exciting times ahead!


    https://hotcopper.com.au/data/attachments/1503/1503286-6d6aae353f855e6d12b230f0932fa91f.jpg

 
watchlist Created with Sketch. Add G1A (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.