My apologies - the turnaround time once submitted the EIAS to the Botswana government is between 6 weeks and 3 months which is one of the fastest turnaround times which speaks volumes about how much the botswana govt are committed to the mining industry- in actual fact over 40% of the countries GDP comes from mining sector
Good to see share price close on intraday high of 13.5c even if it were on little volume0- i noticed someone bought around 80,000 shares at the close at 13.5c
MMM
ACB Price at posting:
13.5¢ Sentiment: LT Buy Disclosure: Held