If you think Snowy Hydro 2.0 was ever going to be built for $2b,...

  1. 10,679 Posts.
    lightbulb Created with Sketch. 39
    If you think Snowy Hydro 2.0 was ever going to be built for $2b, thats laughable.
    Dates $Original > $Final #2022 costs for
    Sydney Harbour Bridge...1923-32 $?m > $20m #$1b
    Opera House...1959-73 $7m > $102m #$1.1b
    Snowy Hydro 1.0... 1944-73 $?m > $820m #$8.6b

    Has there ever been a major project finished on time & budget?


 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.