Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change, page-34875

  1. 11,967 Posts.
    lightbulb Created with Sketch. 474
    That Network costs will go up 200 or 300% under the rollout for renewables if they build 28,000km of new transmission lines at $9,000,000 per km = $ 252,000,000,000...Besides the Capex, OPEX (maintenance ect) will be truly eyewatering.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.