The US’s largest co-located solar + battery storage project is online
The Gemini Solar + Storage project in Nevada – the US’s largest co-located solar + battery energy storage system – is now operational.
The Gemini project, which sits on federal land in Clark County, Nevada, can power approximately 10% of Nevada’s peak power demand. NV Energy signed a 25-year power purchase agreement for the energy produced by the plant.
The enormous 690-megawatt (MW) project, which Primergy Solar and Quinbrook Infrastructure Partners developed, features 1.8 million bifacial solar panels. The solar arrays are co-located with 380 MW of four-hour battery storage to provide 1,400 MWh of clean power after the sun sets.
The project’s DC-coupled storage configuration enables the battery storage to charge directly from the solar panels onsite, increasing efficiency.
https://electrek.co/2024/07/23/us-largest-co-located-solar-battery-storage-project-is-now-online/
- Forums
- Political Debate
- Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change
Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change, page-35988
-
- There are more pages in this discussion • 8 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
1CG
ONE CLICK GROUP LIMITED
Mark Waller, MD
Mark Waller
MD
Previous Video
Next Video
SPONSORED BY The Market Online