The US’s largest co-located solar + battery storage project is...

  1. 36,857 Posts.
    lightbulb Created with Sketch. 4


    The US’s largest co-located solar + battery storage project is online


    The Gemini Solar + Storage project in Nevada – the US’s largest co-located solar + battery energy storage system – is now operational.

    The Gemini project, which sits on federal land in Clark County, Nevada, can power approximately 10% of Nevada’s peak power demand. NV Energy signed a 25-year power purchase agreement for the energy produced by the plant.

    The enormous 690-megawatt (MW) project, which Primergy Solar and Quinbrook Infrastructure Partners developed, features 1.8 million bifacial solar panels. The solar arrays are co-located with 380 MW of four-hour battery storage to provide 1,400 MWh of clean power after the sun sets.

    The project’s DC-coupled storage configuration enables the battery storage to charge directly from the solar panels onsite, increasing efficiency.


    https://electrek.co/2024/07/23/us-largest-co-located-solar-battery-storage-project-is-now-online/
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.