"I'm still waiting you to post the facts for these whoppers you...

  1. 1,400 Posts.
    lightbulb Created with Sketch. 1

    "I'm still waiting you to post the facts for these whoppers you posted earlier."

    "The batteries all fail to provide the first function due to their limited capacity relative to the demand, i.e. hundreds of megawatts versus gigawatts."

    S.A. peak summer demand 2019, occurred 19/12/2019 -- 3221MW
    S.A. peak winter demand 2020, occurred 09/06/2020 -- 2512MW
    source: https://www.aer.gov.au/wholesale-markets/wholesale-statistics/seasonal-peak-demand-regions

    Hornsdale battery max power delivery 150MW
    source: https://en.m.wikipedia.org/wiki/Hornsdale_Power_Reserve

    Conclusion: In the presence of an event similar to the loss of interconnector that occurred in 2016, would result, in the absence of other generation/storage, of partial load-shedding, ie. BLACKOUT, across approximately 94% to 95% of the state.

    Horndale is able to supply 193.5MWh. So after blacking out 94%plus of S.A., Horndale at best would supply that remaining 6% load for 1.3 hours at most.



 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.