Accelerate the World's Transition to Sustainable Energy - to fight Anthropogenic Climate Change, page-8295

  1. 38,156 Posts.
    lightbulb Created with Sketch. 4
    Care to dispute the numbers on Hinkley Point C ?

    " The nuclear power station being built at Hinkley Point will start operating a year later than planned and will cost an extra £3bn, EDF has said.

    The revised operating date for the site in Somerset is now June 2027 and total costs are estimated to be in the range of £25bn to £26bn. "

    https://www.bbc.com/news/uk-england-somerset-61519609

    https://www.ft.com/content/7cebc600-3bad-48f7-9b33-11fc7cedac32

    https://www.reuters.com/business/energy/edf-announce-new-cost-increase-delay-hinkley-point-nuclear-plant-2022-03-28/
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.