EKA 0.00% 45.0¢ eureka energy limited

Sharejon.Sorry, my calcs are for 3 net wells being drilled this...

  1. 2,951 Posts.
    lightbulb Created with Sketch. 166
    Sharejon.

    Sorry, my calcs are for 3 net wells being drilled this calender year (not 4), one net well every 3 months for 9 months, which ads up to 49 gross wells as stated by AUT.

    IMO calcs should be right in line if things go to plan, as i have used decline curves and taken into account the different lengths of time each well will be producing.

    -----------------------------------------------------------

    Here are the calculations and production figures i used for an average well -


    1st well - 10 months production

    1st 28 days - 1050 boepd or 29,400 boe
    2nd 28 days - 1000 boepd or 28,000 boe
    3rd 28 days - 875 boepd or 24,500 boe
    4th 28 days - 775 boepd or 21,700 boe
    5th 28 days - 650 boepd or 18,200 boe
    6th 28 days - 575 boepd or 16,100 boe
    7th 28 days - 500 boepd or 14,000 boe
    8th 28 days - 525 boepd or 14,700 boe
    9th 28 days - 530 boepd or 14,840 boe
    10th 28 days - 475 boepd or 13,300 boe

    Total production of the 1st well over the 10 month period = 194,740 boe

    -----------------------------------------------------------

    2nd well 7 moths production -

    1st 28 days - 1050 boepd or 29,400 boe
    2nd 28 days - 1000 boepd or 28,000 boe
    3rd 28 days - 875 boepd or 24,500 boe
    4th 28 days - 775 boepd or 21,700 boe
    5th 28 days - 650 boepd or 18,200 boe
    6th 28 days - 575 boepd or 16,100 boe
    7th 28 days - 500 boepd or 14,000 boe

    Total production of the 2nd well over the 7 month period = 151,900 boe

    -----------------------------------------------------------

    3rd well 4 moths production -

    1st 28 days - 1050 boepd or 29,400 boe
    2nd 28 days - 1000 boepd or 28,000 boe
    3rd 28 days - 875 boepd or 24,500 boe
    4th 28 days - 775 boepd or 21,700 boe

    Total production of the 3rd well over the 4 month period = 103,600 boe

    -----------------------------------------------------------

    Total production of all wells accounting for different production time frames = 450,240 boe

    Add this figure to existing production -

    450,240 + 120,960 = 571,200 boe or

    2012 average production rate of 1564 Boepd and

    net of royalty rate of = 1173 boepd

    EBITDAX of = $35,471,520

    I have been told by a reliable source that AUT and EKA recieve a $5 premium to WTI. So at the moment they are recieving ~ $107 a bbl, i am also not taking into account NGL stripping so IMO at the current point in time $90 a bbl is good for calculating.

    Yeah ill shoot you a message later on today to discuss sharejon.
 
watchlist Created with Sketch. Add EKA (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.