Updated figures
The final open pit optimisation modifying factors utilised to calculate the breakeven cut-off grade for the Ore Reserve estimate were:
•Processing cost = A$5.42/t ore
•Price (CFR destination incl. premium) = A$227.80/t
•Transport and shipping cost = A$42.15
•Royalties (@ 6.25% of Mine Gate Price i.e. price – transport) = A$11.60
•Net Commodity Price = A$174.05/t concentrate
•Recovery = 97%
=> Breakeven cut-off grade (eDTR%) =$5.42
$174.05 x 97%
= 3.21% eDTR
ASX 20/3/23: Razorback iron project ore reserves increase 340% - Amended Section 4: Cut of parameters p.12
https://cdn-api.markitdigital.com/apiman-gateway/ASX/asx-research/1.0/file/2924-02645739-6A1141627?access_token=83ff96335c2d45a094df02a206a39ff4
- Forums
- ASX - By Stock
- Achieved Goals, Future Goals & Timeline
Updated figures The final open pit optimisation modifying...
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGT (ASX) to my watchlist
(20min delay)
|
|||||
Last
19.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $19.44M |
Open | High | Low | Value | Volume |
19.0¢ | 19.0¢ | 19.0¢ | $1.9K | 10K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 45000 | 18.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 68856 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 45000 | 0.185 |
9 | 59155 | 0.180 |
6 | 98682 | 0.170 |
3 | 14400 | 0.165 |
1 | 8000 | 0.160 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 68856 | 4 |
0.200 | 20919 | 3 |
0.220 | 3773 | 1 |
0.250 | 3120 | 1 |
0.000 | 0 | 0 |
Last trade - 10.04am 18/09/2024 (20 minute delay) ? |
Featured News
MGT (ASX) Chart |