Its pumped hydro so the water is pumped up during off peak and let duwn to produce piwer during peak needs. If the system became totally dry it would fail but it keeos yding the same water.
- Forums
- ASX - By Stock
- Acland Mine Approval
Its pumped hydro so the water is pumped up during off peak and...
-
- There are more pages in this discussion • 201 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NHC (ASX) to my watchlist
(20min delay)
|
|||||
Last
$5.07 |
Change
0.110(2.22%) |
Mkt cap ! $4.285B |
Open | High | Low | Value | Volume |
$4.96 | $5.10 | $4.96 | $20.74M | 4.097M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 52171 | $5.06 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$5.08 | 1588 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 52171 | 5.060 |
8 | 41135 | 5.050 |
3 | 46094 | 5.040 |
4 | 40858 | 5.030 |
2 | 7819 | 5.020 |
Price($) | Vol. | No. |
---|---|---|
5.080 | 1588 | 1 |
5.090 | 75049 | 6 |
5.100 | 135728 | 13 |
5.110 | 29208 | 4 |
5.120 | 23567 | 5 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
NHC (ASX) Chart |