Gocerler-5 Well Flows at 10.4MMcfd 21/2/03 7:34:00 PM
At 2.30 am WST on Friday, 21 February 2003, the Gocerler-5 well was perforated and in a series of tests flowed at a stabilised rate of 10.4 mmcfd through a half inch surface choke at a surface flowing pressure 1640 psi.
The well has been shut in awaiting tie-in to the central gas processing facility.
This is a very pleasing result and proves continuity of reservoir and reservoir quality in the northeastern sector of the field.
Joint Venture approves drilling of Adatepe-1
Yesterday, the Thrace JV approved the drilling of the Adatepe prospect, located 6 kilometres east-southeast of the Gocerler Gasfield.
The Adatepe prospect is an anticlinal structure with seismic amplitude anomalies at 5 stratigraphic levels. The prospect is well definedwith high quality 3D seismic.
The Adatepe-1 well will be drilled with the rig just released from the Gocerler-5 well. Drilling is anticipated to start towards the end of March 2003.
The Gocerler Gasfield is operated by Amity and owned by Amity (50%) and Turkiye Petrolleri AO (50%).
For further information and updates, please refer to Amity's website at www.amityoil.com.au.
A Barton CHAIRMAN
AYO Price at posting:
0.0¢ Sentiment: None Disclosure: Held