-
Share
20/07/16
11:30
Share
Acra Gold Results Due
Pioneer is remaining busy at Acra, following significant gold intersections from the Kalpini South Prospect.
The next work programs are planned for completion during the April‐June 2016 quarter and will include:
- Reverse circulation drill testing for shallower supergene gold mineralization overlaying high grade gold lodes; and
Infill and extensional aircore drilling, plus reverse circulation drilling of the Deep River and Kalpini West Targets.
Lots of news should be flowing soon.
-