DRILLING ACTIVITY REPORT
Activity continues on Caspian’s first well in its eleven well drilling programme in the northern Fergana Basin, Kyrgyz Republic. The well, on the southern edge of Caspian’s Ashvaz block, is designed to appraise the extent of the Mailisu III oilfield. The initial targets are Palaeogene limestone beds V and VII. Details of the well and activity during the week are set out below.
Well Name
Caspian Interest
Type
Location (Tenement)
Latitude / Longitude
Drill Depth
Spud Date
Current Activity
COG Mailisu III # 1
100%
Oil exploration
Ashvaz Block
41.260774°N 72.457251°E
143m
26/09/2007
Waiting on Cement
Weekly Activity After setting surface casing in the COG Mailisu III # 1, drilling recommenced and reached a depth of 143m before the problems of lost circulation re-occurred. Another cement plug has been run to remediate the problem and it is anticipated that drilling will recommence Saturday 13th October
- Forums
- ASX - By Stock
- activity report
DRILLING ACTIVITY REPORTActivity continues on Caspian’s first...
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)