Currently the line from Olympic Dam to Northern terminal station...

  1. 330 Posts.
    Currently the line from Olympic Dam to Northern terminal station is privately owned by the mine (BHP), built by WMC when OD was initially being constructed.

    http://www.electranet.com.au/network_mapState.html

    It is 275kV and has no tower capacity for an additional load in bound to BHP. BHP have negotiated with Electranet to sell the line to them and/or get an augmentation built to accomodate the new load at OD after its expansion, and/or get the 132KV backup line from Pimba (Woomera) upgraded to 275kV.

    EN are (however) the most expensive line constructor in Aus.

    Many many plants have struggled to get connection agreements and or line construction at reasonable rates, often getting the construction done by others (Transfield, United etc)

    I think current BHP planning is a 300-600mW plant fired by a spur gasline, as an alternative to increased transmission.

    If the GEO's build to Olympic Dam, then they can replace OD's requirements of 105-125 mW and the line essentially drops to zero load, and if they supply up to 250Mw by back loading the line.

    Would need significant load protection infrastructure, as the circuits would be heavily loaded at the 250Mw level, but would be the cheapest logical route to market.

    Yes, still requires $700+m for new lines and requires BHP to take some operating risk in allowing others to use their line.
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
(20min delay)
Last
0.6¢
Change
0.001(20.0%)
Mkt cap ! $4.357M
Open High Low Value Volume
0.5¢ 0.6¢ 0.4¢ $4.406K 856.7K

Buyers (Bids)

No. Vol. Price($)
14 5274884 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.6¢ 6058246 9
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
RNE (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.