ADV 3.70% 14.0¢ ardiden ltd

Looks like they left themselves 500 meters of the 3000meter...

  1. 1,128 Posts.
    lightbulb Created with Sketch. 355
    Looks like they left themselves 500 meters of the 3000meter drill program planned for the summer program, I just noticed the "proposed drill" to go deeper following up on the second drill hole (KAS-20-02) from our recent results.. I wonder if they are going to head back and shoot another couple of drills deeper back here to chase the depth to round off their 3000 meters. I would assume this is the smartest thing to do instead of more exploratory drilling west.

    https://hotcopper.com.au/data/attachments/2646/2646469-ba9a24aad8b95e77a9ea5c8d407edb0b.jpg

 
watchlist Created with Sketch. Add ADV (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.