If there has been historic mining on the area then that would mean that there would be mining permits in place - this could be years ahead of others who are scratching around. With mining already having been done, there will be data that can be re-assessed and could see a fast track to production. A long way to go and due diligence to complete but the rewards here could be substantial
R
- Forums
- ASX - By Stock
- CAV
- Advanced Li project potential
Advanced Li project potential
-
- There are more pages in this discussion • 109 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LU7
Discover the strong preliminary feasibility of the Bécancour Lithium Refinery, showcasing resilience in a low pricing environment and a strategic plan to capitalize on future price recoveries
Add CAV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.4¢ |
Change
0.000(0.00%) |
Mkt cap ! $16.36M |
Open | High | Low | Value | Volume |
0.4¢ | 0.4¢ | 0.4¢ | $5.225K | 1.306M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 23830246 | 0.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.5¢ | 36909306 | 32 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
24 | 23830246 | 0.003 |
24 | 28727936 | 0.002 |
17 | 34105562 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.005 | 36909306 | 32 |
0.006 | 19696418 | 19 |
0.007 | 3224571 | 7 |
0.008 | 6745259 | 9 |
0.009 | 3830588 | 4 |
Last trade - 10.30am 04/10/2024 (20 minute delay) ? |
Featured News
CAV (ASX) Chart |