This is f#%$& rediculous, why have a skid rig there when it sits idle for at least 3 weeks, the three other holes could have been drilled to the kick off point in the meantime. Or at the very least BBong should be at the stage of drilling the lateral. This is a circus. The key to pad drilling is meticulous scheduling, thats where the money is saved, not wasted sitting idle. Wtf is going on. If there is a positive in there please find it for me.
SSN Price at posting:
2.4¢ Sentiment: None Disclosure: Held