AOI announced they would acquire 2600 kms on the Dharoor block so they are a little short. AOI have spent the US$22.5 million on the Dharoor block so RRS now have to come up with 20% of drilling costs. RRS had 555 kms of seismic and have effectively given away 80% of the block to acquire only another 782 kms.....lol. By the time things have finished in the Nogal RRS will not be free carried for any drilling there either.
- Forums
- ASX - By Stock
- africa oil seismic program complete in dharoor
AOI announced they would acquire 2600 kms on the Dharoor block...
-
- There are more pages in this discussion • 21 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)