Here ya go champ. From MAK's 2006 prospectus:-
"In January 2000 Rio Tinto Technical Services conducted a Prefeasibility Study using available data. This study included an estimation by Duncan Hackman and Associates of the total inferred resources identified in various localities by the drilling completed to that date. The estimate was 1,955Mt at 14.4% P2O5. The maximum assayed grade was 28.6% P2O5. Hackman considered that the estimated resource grade was too low and that infrastructure at that time was not adequate"
http://www.minemakers.com.au/downloads/prospectus/independent_consulting_geo_report.pdf
Cheers!
- Forums
- ASX - By Stock
- AEV
- after trade announcement
after trade announcement, page-22
-
- There are more pages in this discussion • 19 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AEV (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $24.33M |
Open | High | Low | Value | Volume |
0.9¢ | 0.9¢ | 0.9¢ | $27.26K | 3.029M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 2171348 | 0.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.0¢ | 504157 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 2171348 | 0.009 |
7 | 1144999 | 0.008 |
4 | 1442142 | 0.007 |
7 | 13343328 | 0.006 |
2 | 1500001 | 0.005 |
Price($) | Vol. | No. |
---|---|---|
0.010 | 353886 | 3 |
0.011 | 338297 | 1 |
0.012 | 1697294 | 8 |
0.013 | 860857 | 3 |
0.014 | 1210000 | 3 |
Last trade - 11.06am 01/11/2024 (20 minute delay) ? |
Featured News
AEV (ASX) Chart |