REC: The last announcement did include these indications of...

  1. 132 Posts.
    lightbulb Created with Sketch. 10
    REC: The last announcement did include these indications of dates:

    Next Steps
    • Completion of drillholes BHRCD018 and BHRCD023 by late April,
    • Detailed logging and analysis of all drill core before submission to laboratory for assays, and
    • Completion of downhole electromagnetic (DHEM) surveying by mid-April.

    Last edited by Jazz9000: 08/04/22
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.