MTM ann -15th november 2023 -- these may be the results from Pomme Project --should be Dec or Jan 2024. imo
Our confidence in the extent of the mineralised system at the Pomme Project increases as each new
set of drill hole assays is received and we anticipate obtaining the results for the remaining six holes
from the drilling campaign within the next month.
- Forums
- ASX - Day Trading
- Afternoon trading December 21
MTM ann -15th november 2023 -- these may be the results from...
-
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)