Commencement of Drilling Operations at Mount Mackenzie Gold and Silver Project
• Drilling contractor mobilising with operations to commence on Saturday, 20 Feb 2021. • Earthworks for drill pads and access preparation completed. • 1000m of drilling planned to include significant intervals of coring for metallurgical test work. • Metallurgical consultants JT Met Services have been engaged to develop and supervise the test program