Afternoon trading February 19, page-171

  1. 1,287 Posts.
    lightbulb Created with Sketch. 75
    ELTHow has the market not woken up to this, Tin is the most over looked mineral.

    The Company’s drilling program follows the release of the company’s Oropesa Economic Study in May2020, which positioned the project as a low cost, globally significant new tin development with a prospective annual production of 2,440 tonnes of tin-in-concentrate over a 14-year mine life*3.The Economic Study was completed with a tin price of USD$19,750 per tonne. The LME tin price is currently over USD21,500 per tonne.

    No brainer


    https://hotcopper.com.au/data/attachments/2926/2926103-0918235a4e08eb1b4c9318448cda240f.jpghttps://hotcopper.com.au/data/attachments/2926/2926106-d029391a57074717fb475b5a44a5b235.jpg
    https://hotcopper.com.au/data/attachments/2926/2926110-a583b550629344325a3278299f86754f.jpg

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.