ELTHow has the market not woken up to this, Tin is the most over looked mineral.
The Company’s drilling program follows the release of the company’s Oropesa Economic Study in May2020, which positioned the project as a low cost, globally significant new tin development with a prospective annual production of 2,440 tonnes of tin-in-concentrate over a 14-year mine life*3.The Economic Study was completed with a tin price of USD$19,750 per tonne. The LME tin price is currently over USD21,500 per tonne.
No brainer
- Forums
- ASX - Day Trading
- Afternoon trading February 19
ELTHow has the market not woken up to this, Tin is the most over...
-
- There are more pages in this discussion • 218 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)