HOR old drill results
drill results AND placement coming out in the next week or so
BET they happen on the same day
pump it high to unload
47m @ 8.35% Cu from 37m (RC-846 – Drilled 1993)
• 98m @ 2.54% Cu from 58m (RC-368 – Drilled 1987)
• 44m @ 3.98% Cu from 158m (RC-420 – Drilled 1987)
• 47m @ 3.43% Cu from 39m (RC1152 – Drilled 1993)
• 32m @ 3.11% Cu from 43m and 35m @ 2.80% Cu from 160m (RC1068 – Drilled 2012)
• 51m @ 1.92% Cu from 38m (RC1091 – Drilled 2012)
• 28m @ 3.39% Cu from 72m (RC-666 – Drilled 1988)
• 28m @ 3.28% Cu from 9m (RC1135 – Drilled 2015)
• 72m @ 1.11% Cu from 32m
- Forums
- ASX - Day Trading
- Afternoon trading February 7
Afternoon trading February 7, page-30
-
- There are more pages in this discussion • 141 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)