Afternoon trading November 16, page-25

  1. 26,393 Posts.
    lightbulb Created with Sketch. 320
    • CAE
    • $0.250
    • $0.020 (8.70%)


    TA wise, once it gets past 26c, there is the gap at 33.5c to fill, followed by a test at 43c.

    Holes 15 & 16 drilling results are next, arriving from lab.

    These guys are already half way through drilling Hole 17, lol...

    Pushing things along at full steam !! for JORC resource upgrade (copper, gold & silver)
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.