STX 5.26% 18.0¢ strike energy limited

The quotes below should only be taken as a guide to the next...

  1. 988 Posts.
    lightbulb Created with Sketch. 32
    The quotes below should only be taken as a guide to the next announcement. They are consistently upbeat, not unlike the majority of posts on HC by a couple of relentless posters; but in spite of the positivity SH's are left to hang their hats and wallets on their consistent and continual hyperbole.

    Let us hope the next announcement is more convincing!


    21 June 2016
    “The productivity improvements we have seen at Klebb 3 and the fact that we have now successfully completed 7 fracs in the Patchawarra coals are important milestones ‐ they’re further confirmation of our confidence in the long term productive capacity of the field and our ability to commercialise it.


    31 March 2016
    These next steps are designed to deliver substantially higher well performance
    leading to gas flows above threshold commercial rates.


    22 /12 /2015
    “We are really excited by the performance of the Klebb Phase 3 pilot wells. We are building momentum and fully expect that the wells will demonstrate productive capacity exceeding our threshold commercial gas rates.”

    10/11/15
    “The new pump equipment and operating procedures deployed at Klebb 1 have proven to work very successfully. We are pleased with the way the wells are performing and expect continued progress over coming weeks now that all three wells are online.”

    24/9/15
    “We are extremely pleased with the early results and well performance that we are seeing. All the
    indicators are pointing towards commercial gas rates being achievable – the key will be to maintain
    stable and trouble free flow testing over the coming months.”

    10/8/15
    “Having successfully completed the workover program, our focus is now on building production rates over coming weeks to reduce reservoir pressure. We know that pressure reduction leads to increased gas flows and all the facilities are now in place to achieve our objective of commercial rates.”

    31/3/2015
    These next steps are designed to deliver substantially higher well performance
    leading to gas flows above threshold commercial rates.

    16/12/2014
    Having already achieved our key objectives, we are now focussed on building gas production over
    coming months to underpin the accelerated development of the project.
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
18.0¢
Change
-0.010(5.26%)
Mkt cap ! $515.7M
Open High Low Value Volume
18.5¢ 18.8¢ 18.0¢ $829.9K 4.561M

Buyers (Bids)

No. Vol. Price($)
41 1034210 18.0¢
 

Sellers (Offers)

Price($) Vol. No.
18.5¢ 484437 6
View Market Depth
Last trade - 16.10pm 08/08/2024 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.