LPD 0.00% 0.2¢ lepidico ltd

I read it as site size more than anything else. They have three...

  1. 2,024 Posts.
    lightbulb Created with Sketch. 324
    I read it as site size more than anything else. They have three different sites in Sudbury with a preference to one. They went on about infrastructure all being in place etc. Then mentioned the size ie one football field.
    My take is that a phase 2 plant will take considerable more effort to bring to fruition.

    Scaling up to a full size plant requires at least 7 times the area and a lot more investigation. By having phase 2 separate, will allow phase 1to fully function independently while construction is taking place, and continue to do so through commissioning.
 
watchlist Created with Sketch. Add LPD (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $17.17M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $3.474K 1.736M

Buyers (Bids)

No. Vol. Price($)
24 20906766 0.2¢
 

Sellers (Offers)

Price($) Vol. No.
0.3¢ 53858559 56
View Market Depth
Last trade - 10.04am 02/09/2024 (20 minute delay) ?
LPD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.