Thanks Captain
The delay for the BFS was mentioned in the last report ...
"Consequently a programme of testwork specifically aimed at determining the viability of the ore to be bulk processed via heap leach processing has commenced and will take approximately two months to complete. Following completion, the pre-feasibility part of the overall study will be finalised and definitive feasibility completed. Subsequently the detailed engineering work has been scheduled back by a few months. The significant advantage of processing via heap leach is a substantial reduction in overall capital costs which should translate to a material improvement in project economics and a broadening of financing options"
The benefit of heap leaching is massively important to BMN, as it will drastically reduce the initial CAPEX required.
With the financial crisis as it is, this is a positive evelopement, and the extra engineering trials are well worth waiting for IMO.
Once again ... welcome back
cheers for now
- Forums
- ASX - By Stock
- agm monday
Thanks CaptainThe delay for the BFS was mentioned in the last...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BMN (ASX) to my watchlist
(20min delay)
|
|||||
Last
$2.97 |
Change
0.000(0.00%) |
Mkt cap ! $530.4M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 3824 | $3.12 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.83 | 1138 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 2.960 |
2 | 741 | 2.950 |
1 | 3000 | 2.940 |
3 | 10800 | 2.930 |
1 | 400 | 2.920 |
Price($) | Vol. | No. |
---|---|---|
3.070 | 4749 | 2 |
3.080 | 1677 | 1 |
3.090 | 3000 | 1 |
3.100 | 9262 | 2 |
3.140 | 3000 | 1 |
Last trade - 09.56am 04/11/2024 (20 minute delay) ? |
Featured News
BMN (ASX) Chart |
Day chart unavailable