STX 4.26% 22.5¢ strike energy limited

AGM, page-51

  1. 5,348 Posts.
    lightbulb Created with Sketch. 2642
    Mrdin,

    There are too many factors at this stage to suggest a flow rate that is commercial.

    I would guess that a reserve certification would occur if the sustained rate remains above 250-300 mscf/d over 3 months. That would then possibly facilitate the decision to plan for the drilling of Jaws 2. The certification of a reserve should allow for the project to be moved to the next stage.
    I do think that to trigger further investment they would like to see it closer to 500 mscf/d or more though.

    Jaws 2 would be optimized greatly over the Jaws 1 well and could produce much better results as they may change frac conditions, well lengths, pumping rates, plus many other things. So commercial for this well as a stand alone well is hard as there have been cost over-runs that wouldn't necessarily occur with future wells. It is more a proof of concept commercial flow in a larger development environment that we are looking for.

    The better question is to ask what EUR is needed, and in what time frame, for wells to be commercial in a broader field development environment.

    My hurdles are 250-300 mscf/d for reserve certification, then 500-750 mscfd for a strong indication of good field development characteristics and a level at which large capital could flow our way.


    IMO
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
22.5¢
Change
-0.010(4.26%)
Mkt cap ! $645.0M
Open High Low Value Volume
23.5¢ 23.5¢ 22.0¢ $1.297M 5.742M

Buyers (Bids)

No. Vol. Price($)
22 1627112 22.0¢
 

Sellers (Offers)

Price($) Vol. No.
22.5¢ 115583 3
View Market Depth
Last trade - 16.10pm 03/02/2025 (20 minute delay) ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.