88E 33.3% 0.4¢ 88 energy limited

AGM, page-61

  1. 1,643 Posts.
    lightbulb Created with Sketch. 230
    The conditions for "Tundra Opening" are fixed, however DNR are flexible when it comes to local permits, should local conditions allow then its possible that ice roads and pad construction could commence.
    PANR(GBP) constructed their ice road for Talitha-A well before the general tundra opening (12/02/22).
    see RNS 06/01/22
    Pantheon Res Regulatory News. Live PANR RNS. Regulatory News Articles for Pantheon Resources Plc Ord 1P (lse.co.uk)
    Once the ice road and pad are constructed the tundra is protected and full operations can commence.

 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(33.3%)
Mkt cap ! $115.5M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $41.39K 11.83M

Buyers (Bids)

No. Vol. Price($)
626 633703231 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 566198958 140
View Market Depth
Last trade - 16.10pm 21/05/2024 (20 minute delay) ?
Last
0.3¢
  Change
0.001 ( 14.3 %)
Open High Low Volume
0.3¢ 0.4¢ 0.3¢ 18529975
Last updated 15.48pm 21/05/2024 ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.