FMG had C1 costs of A$15/t last quarter operating in areas with a strip ratio of 1.5. We had C1 about A$37/t operation in presumably areas with a strip ratio of 0.25. Take out the rail v truck factor and we are still double their costs and we have to move half the dirt (1.25t vs 2.5t).