Let him talk to himself over there; Definition of unscalable: not capable of being climbed or scaled : not scalable : unscalable peaks.
Rincon Lithium Project
- Staged development strategy - industrial scale pilot plant→2,000tpa→12,000tpa
- Stage 1 – Pilot plant accelerating process and product qualification works
- Stage 2 – 2,000tpa in construction → first commercial production from mid-2022
- Stage 3 – 10,000tpa expansion underpinned by exceptional PEA results
- Meaningful, long life asset – 16.5 year mine life @ 10,000tpa scale
- Ability to extend via deeper drilling (Exploration Target potential upside)
- Experienced team, proven producer, proprietary clean technology – 1st mover advantage
Existing Production
- High level of confidence in chemical process technology via pilot plant operations
- De-risked scale-up of production (2,000tpa to additional 10,000tpa operations)
- Delivery of >25t of high purity battery quality Li2CO3 has enabled the establishment of strong potential off-taker relationships
Next Steps to Commercial Production
- Complete construction of 2,000tpa Li2CO3 operation, production start by mid-2022
- Increase current JORC resource via exploration target drilling works
- Execute investment & off-take agreements for 2,000tpa & 10,000tpa battery quality lithium carbonate product with strategic partner
- Receive EIA regulatory approval for 10,000tpa expansion operation
- Secure capex finance and commence construction of 10,000tpa expansion operation targeted for H1-2022
Owner of the Rincon Lithium Project, Salta Province, Argentina – 77.5% current interest, increasing to 90% ownership upon development of 10,000tpa operation
PEA completed in 2018 - US$399M1 NPV10%, IRR 53%, Opex US$4,645/t (at Li2CO3 price of US$13,000/t) spot price now significantly higher
• Located ~4km from Albermarle’s longstanding Silver Peak operation - the only lithium carbonate operation in USA (operating for +50yrs)
• Geophysical data identifies lithium brine target areas
• Gravity-derived 3D depth inversion model shows favourable structures identified as boundaries of subbasins
• Magnetotelluric (MT) resistivity survey data has defined a major conductive anomaly
• Potential lithium brine aquifer, with depth to the top of this feature varying between 300m to 700m
• Three delineated MT targets correlate very well when overlain with the previously interpreted gravity targets, providing further confidence for future drill testing works
• Next step exploration target works to determine lithium brine prospectivity, then drilling works to test MT targets to delineate lithium brine potential
- Forums
- ASX - By Stock
- AGY Expansion
Let him talk to himself over there; Definition of unscalable:...
-
-
- There are more pages in this discussion • 25 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AGY (ASX) to my watchlist
|
|||||
Last
8.7¢ |
Change
-0.001(1.14%) |
Mkt cap ! $127.3M |
Open | High | Low | Value | Volume |
8.9¢ | 8.9¢ | 8.7¢ | $101.0K | 1.155M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 61473 | 8.7¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.8¢ | 323875 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 569092 | 0.087 |
14 | 647616 | 0.086 |
13 | 601035 | 0.085 |
1 | 67869 | 0.084 |
4 | 199677 | 0.083 |
Price($) | Vol. | No. |
---|---|---|
0.088 | 325711 | 8 |
0.089 | 279088 | 6 |
0.090 | 968990 | 6 |
0.091 | 100000 | 1 |
0.092 | 21869 | 1 |
Last trade - 14.24pm 21/06/2024 (20 minute delay) ? |
Featured News
AGY (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online