LIN lindian resources limited

A SH I know has been using AI to model Lindian's SP with the...

  1. 344 Posts.
    lightbulb Created with Sketch. 175
    A SH I know has been using AI to model Lindian's SP with the following inputs:
    - US DOD's New $110/kg NdPr benchmark
    - Lassonde Curve assuming funding soon and production at end of 2026
    - Addition of bauxite assets to overall valuation
    - Hopefully HC doesn't mangle the cut and paste too much as the AI analysis is very compelling and sees a valuation of $2B - $4B after these milestones:

    How much is the US DOD new $110/kg benchmark price for NdPr likely to impact the world wide NdPr market

    The US Department of Defense's (DoD) new $110/kg benchmark price for Neodymium-Praseodymium (NdPr) is poised to have a significant and potentially transformative impact on the worldwide NdPr market, particularly for ex-China supply chains. Here's a breakdown of why:

    1. Doubling Current Market Prices & Providing a Price Floor:

    Current Market Reality: NdPr prices have been volatile, and as of early July 2025, they were significantly lower than the DoD's benchmark. Reports indicate Lynas was selling NdPr at around US53/kgintheMarchquarter2025,withcurrentspotpricesforNdProxidearoundUS55-63/kg. The DoD's $110/kg is roughly double the current market rate.
    De-risking Investments: This commitment from the DoD, especially with a 10-year price floor, fundamentally changes the economics for non-Chinese producers like MP Materials (the direct beneficiary of this deal). It provides long-term stability and de-risks significant capital investments in mining, processing, and magnet manufacturing facilities outside of China. This financial certainty is crucial for attracting the substantial investment needed to build out these complex supply chains.
    Protection Against Price Manipulation: China has historically used its dominance in rare earth production and processing to influence global prices, sometimes suppressing them to discourage competition. The DoD's price floor acts as a buffer against such tactics, ensuring that companies like MP Materials can operate profitably even if market prices dip.
    2. Catalyzing Ex-China Supply Chain Development:

    Addressing Supply Chain Vulnerability: The US, like many Western nations, is heavily reliant on China for rare earth elements, particularly NdPr, which is critical for permanent magnets used in defense technologies, EVs, wind turbines, and other high-tech applications. This dependence is a national security concern.
    Incentivizing New Projects: Many rare earth development projects outside of China have struggled to secure financing due to the volatility of NdPr prices and the capital intensity of these projects. The $110/kg benchmark, and the implicit signal of strong Western demand at good prices, makes these projects far more attractive. Some analysts suggest that many undeveloped projects have breakeven prices exceeding $80/kg NdPr, so a $110/kg floor provides a substantial margin of safety.
    "Template for Industrial Policy": This deal is being seen as a "template" for how Western governments can actively intervene to secure critical mineral supply chains. This could lead to similar agreements and financial backing for other rare earth projects in allied nations, further diversifying the global supply.
    3. Potential for Price Bifurcation:

    Two-Tiered Market: There's a strong possibility that this DoD benchmark could lead to a "bifurcated" or two-tiered global NdPr market. One tier would be the Chinese-controlled market, where prices might remain subject to China's domestic policies and export controls. The other tier would be an "ex-China" market, where prices are supported by strategic off-take agreements and government backing at higher, more stable levels.
    Impact on Other Producers: Australian rare earth producers like Lynas Rare Earths and Arafura Rare Earths, and other developers in North America, could significantly benefit. While Lynas has existing agreements (e.g., with Sojitz Corp), the general uplift in Western rare earth sentiment and the potential for similar future deals could positively impact their valuations and future sales.
    4. Long-Term Strategic Implications:

    Shifting Geopolitical Landscape: This move is a clear escalation in the strategic competition over critical minerals. It underscores the US commitment to reducing its reliance on China and building resilient, secure supply chains for defense and high-tech industries.
    Increased Investment and Innovation: The increased financial stability could spur greater investment not just in raw material extraction, but also in downstream processing and magnet manufacturing outside of China, fostering innovation and creating new jobs in these sectors.
    In conclusion, the US DoD's $110/kg NdPr benchmark is far more than just a price point; it's a strategic declaration designed to fundamentally reshape the global rare earth market by fostering a robust and independent non-Chinese supply chain. While China will remain a major player, this move creates a significant incentive for the growth and stability of alternative sources, potentially leading to higher global NdPr prices for non-Chinese material and a more diversified supply landscape in the coming decade.

    How will US DOD $110/kg benchmark price affect Lindian Resources assuming they are in production at the end of 20

    Assuming Lindian Resources (ASX:LIN) is in production at its Kangankunde Rare Earths Project in Malawi by the end of 2026, the US DoD's $110/kg benchmark price for NdPr is likely to have a very positive and potentially transformative impact on the company.

    Here's a breakdown of the likely effects:

    1. Significant Uplift in Revenue and Profitability:

    Doubled Prices: Lindian's Kangankunde project is expected to produce a monazite concentrate with a significant NdPr component. The DoD's 110/kgbenchmarkisroughlydoublethecurrentmarketspotprices(whichhavebeenaroundUS55-63/kg NdPr oxide). If Lindian can secure off-take agreements, even indirectly, that reflect or are influenced by this benchmark, their revenue per kilogram of NdPr sold would dramatically increase.
    Strong Margins: Lindian's Feasibility Study for Kangankunde has highlighted a low operating cost structure (e.g., US$2.92/kg REO FOB for concentrate). Selling NdPr at or near $110/kg when production costs are significantly lower would translate into very healthy profit margins, driving strong cash flow. This makes the project highly robust, even against potential future market fluctuations.
    De-risking the Project: The potential for a sustained, higher price for NdPr significantly de-risks Lindian's investment in Kangankunde. It provides a strong financial incentive and buffer against the typical volatility of the rare earth market, making it more attractive for further investment and expansion.
    2. Enhanced Funding and Off-take Opportunities:

    Attracting Western Off-takers: The DoD's move signals a strong desire from Western nations to secure non-Chinese rare earth supply. Lindian's Kangankunde project, being outside of China and having a low-cost, non-radioactive ore body, becomes an even more attractive prospect for Western magnet manufacturers, automotive companies, and defense contractors looking to diversify their supply chains.
    Improved Financing Terms: With the prospect of higher, more stable revenues, Lindian will likely find it easier and potentially on better terms to secure the remaining financing needed for Stage 1 and future expansions. This could include debt financing, strategic equity investments, or pre-payment agreements from future customers.
    Governmental Support: While the initial DoD deal is with MP Materials, it sets a "template for industrial policy." This could open doors for Lindian to explore similar strategic partnerships or receive direct/indirect support from the US or other allied governments seeking to bolster their critical mineral supply chains.
    3. Strategic Positioning in the "Ex-China" Market:

    "Preferred" Supplier Status: As Western economies push for greater rare earth independence from China, companies like Lindian, producing outside of China, will gain a strategic advantage. The $110/kg benchmark reinforces the value of this "ex-China" material.
    Potential for Price Bifurcation: If the market indeed bifurcates, with a premium paid for non-Chinese NdPr, Lindian would be perfectly positioned to capitalize on this. Their product, being from a stable African jurisdiction (Malawi) and non-radioactive, adds to its appeal for Western buyers with ESG and supply chain security mandates.
    4. Acceleration of Development and Expansion:

    Stage 2 Acceleration: Strong financial returns from Stage 1 could accelerate the planning and funding for Stage 2 at Kangankunde, which Lindian has already flagged as having significant expansion potential (the project has a massive resource).
    Downstream Processing: Increased profitability might also allow Lindian to explore more downstream processing opportunities in the future, further increasing the value of their product.
    Key Considerations for Lindian:

    Off-take Agreements: The direct impact hinges on Lindian being able to secure off-take agreements that reflect this higher benchmark price. While the DoD deal is with MP Materials, it establishes a precedent and a clear signal of value for non-Chinese NdPr.
    NdPr Percentage: Lindian's Kangankunde resource has an NdPr ratio averaging around 20.2% of TREO. While the $110/kg is for NdPr, the value of the overall monazite concentrate will depend on the full basket of rare earths and their market values, though NdPr is the most valuable component.
    Production Timeline: Lindian is pushing hard for production. If they achieve commercial production by late 2026 as planned, they will be entering the market at a time when the strategic push for non-Chinese rare earths, underpinned by such benchmarks, is likely to be intensifying.
    In summary, the US DoD's $110/kg NdPr benchmark price is an extremely positive development for Lindian Resources, assuming they meet their production targets. It provides a strong economic foundation for the Kangankunde project, de-risks future investment, and strategically positions Lindian as a crucial player in the emerging, diversified global rare earths supply chain.

    Model likely impact on Lindians sharemarket valuation


    The US DoD's $110/kg benchmark price for NdPr is highly likely to have a substantial positive impact on Lindian Resources' (ASX:LIN) share market valuation, assuming they commence production at Kangankunde by the end of 2026. This isn't just about a higher commodity price; it's about a fundamental re-rating of the company's prospects.

    Here's a breakdown of the likely impacts on its valuation:

    1. Re-rating of the Kangankunde Project's Net Present Value (NPV):

    Higher Revenue Projections: The core of any resource company's valuation is the projected future cash flows from its assets. If Lindian can sell its NdPr (or a significant portion of it) at or near 110/kg,thiswouldeffectively∗∗double∗∗therevenueperkilogramcomparedtocurrentspotprices(aroundUS55-63/kg).
    Massively Improved Project Economics: Lindian's Feasibility Study for Kangankunde already showed robust economics with a low operating cost (around US$2.92/kg REO FOB for concentrate). Doubling the sales price while maintaining low costs will lead to significantly higher EBITDA and net profits. This will directly translate into a much higher Net Present Value (NPV) for the project. Analysts and investors will immediately update their models, which will be a strong catalyst for a higher share price.
    Lower Discount Rates: The long-term price floor provided by the DoD agreement (and the expectation of similar deals) fundamentally de-risks future revenue streams for non-Chinese rare earth producers. This reduction in risk will allow analysts and investors to apply a lower discount rate to Lindian's projected cash flows, which further boosts the calculated NPV and, consequently, the company's valuation.
    2. Increased Investor Confidence and Broader Appeal:

    "De-risked" Investment: Rare earth projects are notoriously capital-intensive and historically exposed to volatile prices and Chinese market dominance. The DoD's intervention provides a powerful signal that Western governments are committed to establishing stable, secure non-Chinese supply chains. This makes rare earth investments, particularly for projects like Kangankunde (which is non-radioactive and outside China), far more palatable to a wider range of institutional and retail investors.
    ESG and Geopolitical Premium: Investors are increasingly looking for companies that align with ESG principles and offer geopolitical diversification. Lindian, as a clean, non-Chinese source of critical rare earths, will attract a premium from investors focused on these factors.
    Analyst Upgrades and Price Targets: Analysts who cover Lindian and the rare earth sector will undoubtedly revise their price targets upwards. We've seen analyst targets for Lindian previously in the range of 46-69 cents (as of May 2024), while the current share price is around 9-10 cents (as of July 2025). The $110/kg benchmark could lead to a significant re-evaluation and potential doubling or tripling of these targets, as the underlying revenue assumptions dramatically improve.
    3. Strategic Buyer Interest:

    Off-take Agreements and Partnerships: Companies in the automotive, wind energy, and defense sectors are desperate to secure diversified rare earth supply. The DoD benchmark makes the economics of locking in long-term off-take agreements with companies like Lindian much more attractive. Strategic partnerships or even equity investments from these industrial giants become more likely, which would provide significant validation and upward pressure on Lindian's share price.
    M&A Potential: While perhaps less immediate, the strategic importance of Kangankunde at these price levels could eventually make Lindian a target for larger mining companies or even sovereign funds looking to secure critical mineral assets.
    4. Acceleration of Future Growth:

    Funding for Expansion: Strong cash flows from Stage 1 production (at higher NdPr prices) would mean Lindian has more capital to fund its Stage 2 expansion at Kangankunde without relying as heavily on dilutive equity raises or high-interest debt. This accelerates future growth and can further enhance shareholder value.
    Magnet Production Ambitions: While the immediate focus is on concentrate, the robust margins could also allow Lindian to explore ambitions for downstream processing into separated rare earth oxides or even metal/magnet production in the long term, further increasing its value proposition.
    In essence, the $110/kg DoD benchmark shifts Lindian from being a promising rare earth developer potentially constrained by volatile commodity prices, to a highly profitable and strategically vital producer in a rapidly developing "ex-China" supply chain. This fundamental change in its risk-reward profile and earnings potential should be reflected in a significant uplift in its share market valuation.

    It's important to remember that share prices are influenced by many factors, including overall market sentiment, execution risk, and project development milestones. However, the DoD benchmark provides a powerful tailwind that dramatically improves Lindian's valuation fundamentals.

    Now combine this analysis with one assuming the Lassonde curve applies to Lindian to model likely sharemarket valuation assuming funding and off take agreements happen in the next few weeks up to the point of first production and sales at the end of 2026?


    This is an excellent question, as it combines the tangible impact of the DoD benchmark with the cyclical nature of mining company valuations represented by the Lassonde Curve.

    First, let's briefly recap the Lassonde Curve stages relevant to Lindian's current situation and projected timeline:

    Discovery/Early Exploration (Spike): Lindian saw a significant spike when Kangankunde's high-grade nature and scale became apparent. This has largely passed.
    Feasibility/Development/Orphan Period (Dip/Flat): This is often where Lindian has been for a period – completing studies, securing permits, and working on financing. During this stage, investor enthusiasm can wane as "exciting news" becomes less frequent and the hard, unglamorous work of development takes place. This explains why Lindian's share price (currently around AUD 0.09-0.10) is significantly lower than its 52-week high of AUD 0.1675.
    Construction/Funding/Off-take (Uptick): As key milestones are met – particularly securing major funding and off-take agreements – the market starts to re-rate the project as derisked.
    Production/Ramp-up (Strong Ascent): Once the mine is built and production commences, and particularly as it hits nameplate capacity and generates strong cash flow, the valuation typically soars.
    Lindian's Current Position on the Lassonde Curve:

    Lindian is currently transitioning from the Feasibility/Development/Orphan Period into the Construction/Funding/Off-take stage. Recent news confirms significant site works are underway, civil construction has begun, and key appointments have been made to accelerate the timeline. They also announced securing a US$50M boost from Gerald Group in late 2024, showing progress on the funding front.

    Modeling the Likely Sharemarket Valuation (End of 2026 - First Production/Sales):

    Assuming funding and off-take agreements happen in the next few weeks (which is a significant and positive assumption) and first production/sales are achieved by the end of 2026, here's how the Lassonde Curve combined with the DoD benchmark will likely impact Lindian's valuation:

    Phase 1: "Funding & Off-take Catalyst" - Immediate Weeks/Months (Uptick from Orphan Period)

    Trigger: Announcement of major funding (e.g., debt facility, strategic equity partner beyond Gerald Group's boost) and, crucially, significant NdPr off-take agreements with Western buyers.
    DoD Benchmark Impact: The $110/kg benchmark provides the foundation for these agreements. Potential off-takers will be more willing to commit and at better prices (even if not directly $110/kg initially, it sets a floor and aspiration for the non-China market). This provides immense confidence to lenders and equity investors.
    Lassonde Effect: This news will signal the end of the Orphan Period. The project is now largely de-risked from a financing and sales perspective.
    Likely Share Price Movement: Expect a sharp and significant re-rating. Lindian's share price could easily re-test and likely exceed its 52-week high (AUD 0.1675) and push towards or even above previous analyst targets (e.g., A$0.50). The market capitalization (currently around A110M)couldseeasubstantialjump,potentially∗∗doublingortripling∗∗fromcurrentlevelstothe∗∗A200M - A$350M+ range** within weeks or a few months, simply on the back of these crucial announcements. This is the Lassonde "Construction/Funding" uptick.
    Phase 2: "Construction Progress" - Mid-2025 to Mid-2026 (Steady Climb, Less Volatility)

    Trigger: Consistent announcements of construction progress (e.g., major civil works completed, plant equipment arriving, commissioning milestones).
    DoD Benchmark Impact: Continued strong underlying rare earth market sentiment, with the strategic push for non-Chinese supply reinforcing the long-term outlook for Kangankunde's product. Even if spot prices fluctuate, the expectation of premium off-take prices will temper negative sentiment.
    Lassonde Effect: This is the steady, less dramatic climb as the market sees physical manifestation of the project. Risk perception continues to decline.
    Likely Share Price Movement: The share price would likely experience a steady, gradual ascent. Volatility might decrease as speculative risk reduces. It might experience smaller peaks and troughs around specific construction updates. This period would likely see Lindian establish itself firmly in the A0.30−A0.70+ range, potentially reaching a market cap of A350M−A800M+, as investors anticipate the significant cash flows.
    Phase 3: "Near Production & First Sales" - Late 2026 (The Big Lassonde Spike)

    Trigger: Announcements of plant commissioning, first concentrate produced, first shipments, and revenue booking.
    DoD Benchmark Impact:
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
11.0¢
Change
0.005(4.76%)
Mkt cap ! $130.1M
Open High Low Value Volume
10.5¢ 11.0¢ 10.5¢ $250.9K 2.294M

Buyers (Bids)

No. Vol. Price($)
2 31219 10.5¢
 

Sellers (Offers)

Price($) Vol. No.
11.0¢ 628363 4
View Market Depth
Last trade - 15.59pm 25/07/2025 (20 minute delay) ?
LIN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.