5GN 0.00% 14.5¢ 5g networks limited.

al magrabah oil shows to be tested

  1. 356 Posts.
    On completion of the intermediate logging programme, the forward plan is to run a 7” liner prior to drilling ahead into the Basement in a 6” hole. Following completion of drilling, it is intended to test the zone where shows were previously reported.
 
watchlist Created with Sketch. Add 5GN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.