MAY 0.00% 4.9¢ melbana energy limited

so when we drilled the top section we went in hard and fast and...

  1. 12,118 Posts.
    lightbulb Created with Sketch. 653
    so when we drilled the top section we went in hard and fast and then we blew it .haha
    anyways we did damage to the structure on the way down .
    so now we know what we have they want to redrill the top section to pick up the full structure, holding all the oil .
    then we use the hole we are drilling to pick up the two lower section structures .
    thats the way i see it .or am i wrong thinking this way .im no egg bert confused.pngconfused.png
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
4.9¢
Change
0.000(0.00%)
Mkt cap ! $165.1M
Open High Low Value Volume
4.9¢ 5.0¢ 4.8¢ $74.11K 1.515M

Buyers (Bids)

No. Vol. Price($)
20 1286827 4.8¢
 

Sellers (Offers)

Price($) Vol. No.
4.9¢ 365508 2
View Market Depth
Last trade - 16.10pm 17/05/2024 (20 minute delay) ?
Last
4.9¢
  Change
0.000 ( 0.20 %)
Open High Low Volume
4.9¢ 4.9¢ 4.8¢ 1248447
Last updated 15.57pm 17/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.