AYO unknown

alert : moving on.......!, page-4

  1. 3,469 Posts.
    Hi.....AYO's rig has to be reassembled ; tested ; train crew etc.,. TB says that it is scheduled to do oilwell in Adana Basin in April .......This is an AYO controlled operation 100% owned rig + lease area , so AYO control timing and costs......suppose takes abit of organization ........once the rig gets going , it will be full-time on the job as there are 9 wells to be done during 2003 yet .
 
watchlist Created with Sketch. Add AYO (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.