Let's keep a tally of all real builds to date, so we don't lose track when things ramp up.
Build 4
Location: lot 861, 13 Coracina Vista, Wellard 6170
Builders: Dale Alcock on FBR-owned land
Materials: concrete blocks (230mm high)
Weather: blue skies in the photos I saw
Completed: 3 Aug, 2021 to 5 Aug 2021
Details: Lot is 374 sq m
Special: TBA
Income: ? The price paid for 3 of the 5 bare lots was $555,000
===========================================================================
Build 3 (2nd non-residential): childcare centre
Location: Amberton Beach, near Eglinton, northern Perth
Builders: Dale Alcock, using HX2
Materials: concrete blocks. Lintels (up to 4.8m long) made by FBR. Termimesh on slab; waterproof damp course flashing on first course and over lintels (coastal environment).
Weather: some very heavy rain and strong winds
Completed: 5 June, 2021. 16 build days
Details: >60m long slab, big build (size of about 5 houses), walls up to 4.8m high. 8,670 concrete masonry units (36,500 SBE), dble leaf cavity wall. Water not connected to site. Some minor mechanical issues.
Special: 25 windows, many small ones; HX had to build from 5 different positions; FBR made the lintels
Income: ? prevailing commercial rate
==============================================================================
Build 2: community centre (first commercial structure)
Location: Byford, WA; 40km south of Perth; cnr Balawarra and Kardan Blvd
Builders: Archistruct, using HX2 and WaaS
Weather: sunny, cloudy, hail, high winds, heavy rain
Completed: Tues 1 Sept - Tues 8 Sept (HX returned to HQ for weekend)
Details: 390mm x 230mm high x 90mm thick blocks; dble leaf cavity wall, step-down course below the slab; av lay speed 174 blocks/hr (800 SBEs/hr); top speed 228 blocks/hr; 15 courses high (~1.5 storeys); brick ties manually installed. Rendered finish. Tenanted by real estate co and a cafe.
Special: 1st non-residential structure, new adhesive application system
Income: prevailing commercial rate
==================================================================================
Build 1: Display home
Location: 31 Elderberry Drive, Dayton 6055, WA; site bordered by 7 occupied homes
Builders: Archistruct Builders and Designers; using HX2
Weather: fine
Completed: 8 July - 11 July, 2020 (3 and a half days; HX deployed 7 July, started building 8th); Open home 24 April 2021 postponed to 1 May following lockdown.
Details: 3 bedroom, 2 bathroom residential home; 11 courses. 2991 blocks (390 x 230mm x 90mm; 13,759 SBE), single leaf wall. Average lay speed when running 146 blocks/hr (671 SBEs/hr); peak 228 blocks/hr (1,049 SBEs/hr)
Special: First real build; roof trusses and prefab kitchen ordered from 3D TAD; Mike interviewed by Channel 9 News
Income: ? House sold for $532,000
- Forums
- ASX - By Stock
- FBR
- All builds to date
All builds to date
- There are more pages in this discussion • 104 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.4¢ |
Change
-0.001(4.00%) |
Mkt cap ! $106.5M |
Open | High | Low | Value | Volume |
2.5¢ | 2.5¢ | 2.4¢ | $22.11K | 902.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 1488234 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.5¢ | 2053216 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 1488234 | 0.024 |
3 | 743521 | 0.023 |
8 | 1313236 | 0.022 |
9 | 1868815 | 0.021 |
16 | 3326977 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.025 | 2053216 | 1 |
0.026 | 2779870 | 11 |
0.027 | 3552905 | 11 |
0.028 | 4017864 | 6 |
0.029 | 1185337 | 4 |
Last trade - 15.38pm 06/05/2024 (20 minute delay) ? |
|
|||||
Last
2.4¢ |
  |
Change
-0.001 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
2.5¢ | 2.5¢ | 2.4¢ | 526810 | ||
Last updated 14.49pm 06/05/2024 ? |
Featured News
FBR (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online