all good with E4, but E2 remains priority.
E4 went very well. uncounted gas over 3 formations.
E2 is still the priority well as this is the only well that's been side tracked.
last update 19/9 on the above was a mixed bag of fruit. one wonders whether or not it will flow commercial rate.????
a good question to ask the company "future side tracks, will the be drilled further than the first one.????. longer than 2,000 metres. *first was approx 570 metres in length*
also note the PSI in Riversleigh Shale Formation pressure of 45psi. little on the low side.???? could this be a low flow rate.????
this is still a very good news company with some exciting prospects.
if you're a long term holder, this will be at least 6 year plus hold.
indirect..
- Forums
- ASX - By Stock
- all good with e4, but e2 remains priority
all good with E4, but E2 remains priority.E4 went very well....
-
-
- There are more pages in this discussion • 34 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
CC9
Chariot Corporation (ASX:CC9) refines Black Mountain strategy, launching Pilot Mine to seize U.S. lithium opportunity
NEWS
Breakthrough programs slash healthcare events, driving a significant A$1.8M+ annual revenue boost